
- Looking to West side wall of Observatory Control Room. Standing in entrance to Dome. Wall on right is bookshelf and right hand return of Desk. Main entrance on left to the observatory. Staining work to be finished soon.
I have been on a bit of a break from the observatory work for few weeks due to weather, work, and few other happenings. Tonight, I put up the ceiling in the heated control room area of the observatory and started adding the tongue and groove facing on the wall between dome area and the heated control room area. As noticed in pictures I still have a few custom fit siding pieces to add along with sanding and final coats of stain.
I will be adding the right hand return and shelving for books and patchbay items to the right hand side of the desk tomorrow. I am also hoping same day to get back to adding stain coats. I should be wrapping up the control room area during this upcoming week. My next step will be to finish some painting going on in the dome area, along with final modifications to my cabling setup for telescope control, camera(s) control, Guiding control, and various ethernet and phone cables.

Looking at North Wall and Desk Work area. Have to cut custom siding out for this area and add trim. To right hand side of desk is another 3ft which will be a right hand desk return and about a 4ft long set of shelves above it for books and patchbay area.








Recent Comments