Print this Page

Observatory Construction Album

A glimpse of observatory construction from time of pier construction to warm room interior work being completed.  Many details worked out in between these pics and after they were taken. Interior, painting, and landscape work will be completed when weather breaks in early 2011.  Once this work is complete I will post a full video walk through of exterior and interior of the observatory.  This observatory was relocated from near Long Lake, New York.  The floor was broken down into two very heavy pieces.  The walls were broken down into about 8 segments.  The wall height was increased at time of reconstruction along with newly installed warm room and several other minor changes.   A 24 foot truck was rented to relocate the observatory to new location. 

May take a few extra moments to load all images after pressing play!

          

 

Press play to begin slideshow. Place mouse at bottom right corner, and press circle button with 4 arrows for full screen. Press esc to exit slideshow.

Permanent link to this article: http://www.daltonskygazer.com/observatory/observatory-construction

Newsletter plugin provided by casinoonline.se.com