DaltonSkyGazer Observatory Walls Up

This past Wednesday I was able to get the observatory wall sections up with the new taller wall segements in place.  I purposely did not connect all uprights in several areas so that I could have some play with the upper ring for final adjustments(ignore any outta plumb segments).  I decided at this point that I would make a new ring for the dome rollers to sit on.  The older ring is starting to deteoriate a little bit, and now is the best time to replace it.  The new ring will be installed this coming Monday. 

I was dealing with very hot weather again which has really slowed my progress.  The walls going up really made my day.  At this point in time I have to do one final level of the floor, position vertical uprights into proper positions, and replace upper ring assembly.  Once this is done, I will move on to reinforcing walls,  putting up the white aluminum siding and finishing off the slanted roof section.  More work will take place this upcoming Monday and Tuesday.   I am hoping doming may happen as soon as this coming Tuesday no later than Thursday.  Pic below:

Observatory Walls up not yet in final position on all uprights

Permanent link to this article: http://www.daltonskygazer.com/daltonskygazer-observatory-walls-up.html

Leave a Reply

Newsletter plugin provided by casinoonline.se.com